Angebotsfrist
21. Dez 2026, 11:00
Geschätzter Wert
400.000.000 NOK
CPV-Code
45000000
NUTS-Region
NO084
Zweck
Nordre Follo municipality intends to enter into a contract with 1 tenderer for the erection of Fløysbonn secondary school and the demolition of the existing Fløysbonn secondary school.
Verfahren
The project ́s aims and frames Project includes the establishment of a new Fløysbonn secondary school as an 8 parallel school with capacity for approx. 720 pupils and 90 employees. The school shall replace Fløysbonn secondary school from 1970, which was considered unsuitable for renovation. The municipal objective is to replace the existing Fløysbonn secondary school, which is five parallel with a new 8 parallel school. The new and expanded school will also receive pupils from Hellerasten school, who shall be discontinued (not included in the project). Frameworks and prerequisites: A new access road to Sofiemyrhallen must be constructed before the construction site for the new school can be accessed. Infrastructure for Sofiemyrhallen and the existing school, both of which are in operation throughout the entire construction period, must be ensured. The new school shall be constructed, by the current entrance to Sofiemyrhallen, and it shall be completed during the fourth quarter of 2029. What can be built by the school yard must be implemented until the 4th quarter of 2029.The old school must be demolished as soon as the new school is built and the demolition site must then also be set up as a school yard until summer 2030. Brief description of the project ́s extent and complexity: Development of a new access road, parking areas and infrastructure, including handling surface water. A new building with approx. 8,500 m2 gross area, divided between three wings and a central communication area.3. Demolition existed Fløysbonn secondary school 4. Commission and complete the outside area, as well as remove the rigging site located outside the construction area (on the demolition site of old Sofiemyr Primary School). A complete description of the delivery is in the attached documents.
All engineering design services, deliveries and work in connection with the erection of Fløysbonn secondary school, in accordance with the tender documentation and accompanying annexes. The tender deadline has been amended to 21.12.2026(12:00). The deadline for submitting questions is changed to 10.12.2026.
Lose 1 Los
Fløysbonn secondary school
Nordre Follo municipality intends to enter into a contract with 1 tenderer for the erection of Fløysbonn secondary school and the demolition of the existing Fløysbonn secondary school.
- CPV-Code
- 45000000
- Angebotsfrist
- 21. Dez 2026, 11:00
- Geschätzter Wert
- 400.000.000 NOK
Eignungskriterien 6 Einträge
Eintragung in ein Handelsregister
The tenderer is registered in a company register or a trade register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU; suppliers from certain member states may have to fulfil other requirements in the mentioned annex. Minimum qualification requirements The tenderer shall be a legally established company. Documentation: Norwegian companies shall submit a company registration certificate from the Brønnøysund Register Centre. Foreign companies shall submit proof that the tenderer is registered in a company register, professional register or a commerce register in the country where the tenderer is established.
Losbezug: LOT-0000
Durchschnittlicher spezifischer Jahresumsatz
Is the tenderer's average annual turnover within the area requested by the contract and specified in the notice or in the procurement documents for the number of financial years requested: Minimum qualification requirements Description of requirement/documentation: Tenderers must have had a minimum annual turnover of NOK 700,000,000 - on average in the last 3 years (2023-2025) if the accounts for 2025 are not available. The accounts for the years 2022 - 2024 will form the basis for evaluating this qualification requirement. Documented by: Where the tenderer is registered in Proff Forvalt, the contracting authority will use Proff Forvalt (Eniro Norway) to assess fulfilment of the requirement. Where this information is not in Proff Forvalt, tenderers can submit annual accounts for the last 3 approved fiscal years.
Losbezug: LOT-0000
Sonstige wirtschaftliche oder finanzielle Anforderungen
Regarding any other economic and financial requirements that have been stated in the notice or in the procurement documents, the tenderer declares that: Minimum qualification requirements Tenderers must have sufficient economic and financial capacity to be able to fulfil the contract. Tenderers are required to have a bankruptcy rating equivalent to A (low bankruptcy risk) from Proff Forvalt (Proff AS) or better. Documentation requirement: The contracting authority will use Proff Forvalt (Proff AS) to assess fulfilment of the requirement. Therefore it is not necessary for tenderers to send this documentation. The tenderer is expected to have known registered information about the company in Proff AS. If a tenderer chooses to use a parent company to fulfil the requirement, a parent company guarantee must be enclosed. The contracting authority will then use Proff Forvalt to assess the parent company's bankruptcy rating. If the tenderer (e.g. newly established companies) is not subject to bankruptcy proceedings in Proff Forvalt, the tenderer is asked to enclose other appropriate documentation. This can e.g. be the company's annual accounts or extracts thereof, bank declarations or liability insurance certificates, ref. the Public Procurement Regulations §16-4. If one company will use the capacity of other companies to fulfil the requirements for economic and financial capacity, the contracting authority requires that they are joint and severally responsible for the execution of the contract.
Losbezug: LOT-0000
Referenzen über vergleichbare Bauleistungen
Only for public building and construction works: During the reference period the tenderer has carried out the following work of the requested type. The contracting authority can require up to five years experience and allow experience from the previous five years to be taken into consideration. Minimum qualification requirements Tenderers shall have experience from comparable contracts. Comparable assignments means the erection of a primary school, secondary school of an equivalent size, scope and complexity, and other buildings are not considered relevant. Documentation: Complete Annex B : "The tenderer ́s relevant reference projects". Tenderers shall state the 2 (only 2) most relevant assignments during the last 5 years. The assignments must be completed and taken over by the builder. It is the tenderer ́s responsibility to document relevance through the description.
Losbezug: LOT-0000
Qualitätssicherungsnachweise unabhängiger Stellen
Can tenderers submit certificates issued by independent bodies that document that the tenderer fulfils the stated quality assurance standards, including universal design requirements? Minimum qualification requirements Tenderers are required to fulfil the requirements for the Quality System ISO 9001:2015. Equivalent certificates issued by bodies in other EEA states will be accepted. The contracting authority will accept other documentation for an equivalent quality system if the tenderer cannot obtain such certificates by the deadline and it is not due to the tenderer himself. It is a prerequisite that the tenderer documents that these measures correspond to the requested quality assurance standards.
Losbezug: LOT-0000
Umweltmanagementnachweise unabhängiger Stellen
Is the tenderer able to submit certificates issued by independent bodies as documentation that the tenderer fulfils the stated environmental management systems or standards? Minimum qualification requirements Description of the requirement/documentation: Tenderers are required to be certified for environmental management, in the form of ISO 1400:2015, EMAS or the eco-lighthouse programme. Equivalent certificates from bodies in other EEA countries will be accepted. The contracting authority will accept other documentation for equivalent environmental management measures if the tenderer is unable to obtain such certificates by the deadline, and it is not due to the tenderer himself. It is a prerequisite that the tenderer documents that these measures are equivalent to the requested environmental management systems or standards.
Losbezug: LOT-0000
Zuschlagskriterien 2 Einträge
Preis
70 %Completed V05 Price Form
Losbezug: LOT-0000
Qualität
30 %Competence and experience of the offered key personnel weighted at 70% Tenderers shall submit a completed "V07 CV template" for the four (4) offered key persons. The Contracting Authority deems project manager (PL), Site Manager (AL), Engineering Design Group Manager (PGL) and ITB Coordinator as key personnel in the team. The key persons offered shall be the same persons who shall be carry out the assignment. The roles shall be covered by different persons. Questionnaire reference weighted to 30% In addition a completed "V08 Questionnaire for reference" shall be submitted for both of the reference projects for the key persons.
Losbezug: LOT-0000
Ausschlussgründe 24 Einträge
Ausschlussgrund
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, by enforceable judgement been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, involving European Communities or European Union member states (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.
Ausschlussgrund
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted of fraud has been convicted of fraud by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Fraud included in Article 1 of the Convention on protection of the Financial Interests of the European Communities (EFT C 316 of 27.11.1995, p. 48).
Ausschlussgrund
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of money laundering or financing terrorism by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Money laundering or financing terrorism As defined in Article 1 of the European Parliament and Council Directive 2005/60/EF of 26 October 2005 on preventive measures against the use of the financial system for money laundering and financing terrorism (EUT L 309 of 25.11.2005, p. 15).
Ausschlussgrund
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on control of organised crime (EUT L 300 of 11.11.2008, p. 42)
Ausschlussgrund
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.
Ausschlussgrund
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of child labour and other forms of human trafficking by a verdict handed down no more than five years ago, or a rejection period determined directly in the judgement that still applies? Child labour and other forms of human trafficking as defined in Article 2 of the European Parliament and council directive 2011/36/EU of 5. 1 April 2011 on the prevention and control of human trafficking and the protection of its victims and for compensation of the Council ́s framework decision 2002/629/RIA (EUT L 101 of 15.4.2011, p. 1).
Ausschlussgrund
Is the tenderer aware of breaches of environmental provisions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Ausschlussgrund
Is the tenderer aware of breaches of provisions on working conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Ausschlussgrund
Is the tenderer aware of breaches of provisions on social conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Ausschlussgrund
Has the tenderer entered into agreement(s) with other tenderers with the intention of turning the competition?
Ausschlussgrund
Has the tenderer committed serious errors in professional practice? If relevant, see the definitions in national law, the relevant notice or procurement documents.
Ausschlussgrund
Have the tenderer:a) given grossly incorrect information when notifying the information required to verify that there is no basis for rejection, or of the qualification requirements being met,b) failed to provide such information,c) subject to immediately submitting the supporting documents requested by the Contracting Authority, ord) improperly affecting the Contracting Authority's decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award?
Ausschlussgrund
Are tenderers aware of a conflict of interest as stated in national law, the relevant notice or procurement documents?
Ausschlussgrund
Has the tenderer or an entity associated with the supplier advised the contracting authority or in another way been involved in the planning of the competition?
Ausschlussgrund
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Ausschlussgrund
The contracting authority shall state that in Norway there are national rejection reasons. These shall be described in the procurement documents. Tenderers must respond to whether they are in one or more of the situations described in the national rejection reasons. Will the purely national rejection reasons, as stated in the relevant notice or in the procurement documents, apply?
Ausschlussgrund
Have tenderers failed to fulfil all their social security obligations in the country where they are established and in their member state, if this is a different country than what he is established in?
Ausschlussgrund
Has the tenderer not fulfilled his tax and duty obligations in the country in which he is established, and in the contracting authority's member state, if this is a different country than what he is established in?
Ausschlussgrund
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Ausschlussgrund
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Ausschlussgrund
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Ausschlussgrund
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Ausschlussgrund
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Ausschlussgrund
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.